Recent appointments to Greengauge21
Greengauge21 has recently made the following appointment on an interim basis:… Read more › “Recent appointments to Greengauge21”
For responses to transport policy and industry consultations
Greengauge21 has recently made the following appointment on an interim basis:… Read more › “Recent appointments to Greengauge21”
Welcoming the two new bills in this week’s Queen’s Speech, Greengauge 21 Director Jim Steer calls for a genuinely national plan to be developed for high-speed rail (HSR).… Read more › “Greengauge21’s response to Queen’s Speech”
On 23rd April 2013, HS2 Ltd proposed a new 9km tunnel for the section of HS2 between North Acton and Northolt. The original plan was to use the largely disused right-of-way of what was once the Great Western Railway’s main … Read more › “With HS2 now to be tunnelled through Ealing, why not use the surface rail corridor to solve a number of other problems?”
Greengauge 21 has launched an investigation into the market for services that would use the planned connection between HS1 and HS2.… Read more › “Greengauge 21 to study demand for HS2-HS1 connection”